2013-09-22

First benchwork

After dinner on Saturday evening I erected some benchwork. I was able to reuse some braces from the old layout so it went pretty quickly.



I still need to obtain a 12' 2x4 to be attached along the front edge.

On Sunday I cut the plywood for the track that will transition trains from the upper visible layer to the hidden station level: