2022-08-04

Extension tracks landscaped

Now that I have installed all the turnouts and three sensors per track, I have added the cable ducts, indusi magnets, and some weeds to the storage area known as Oberbad.


There are cabinets for storing additional lengths of signal cabling too..


First trains have arrived.


I still have to design and manufacture the dwarf shunting signals, and the little connection boxes for the magnets and signals. The software to control the signals is all done and ready.

I ran an S-Bahn train from Oberbad to the underground station (Wilsnack Tief) and it was nice to see 'Oberbad' appear as the origin on the station platform sign!


Previous post on Oberbad:

https://cabin-layout.mixmox.com/2020/06/storage-expansion3.html